January 25, 2020

Put Suisun City on HGTV!

Let’s Do This Thing!

How would you like to be part of bringing HGTV to Suisun City?  Ben and Erin from HGTV’s HomeTown are preparing for the BIGGEST Renovation Project that HGTV has EVER done! They’ll be doing a hometown makeover an ENTIRE town! In other words, they’ll be renovating homes, gathering places and revitalizing a main street.

[Read more…]

Post expires at 3:34 pm on February 7, 2020

NTC- Suisun Marina Docks Water Line Replacement Project

The Department of Recreation, Parks and Marina has issued a Notice to Contractors inviting qualified contractors to provide proposals for the Suisun Marina Docks Water Line Replacement Project.
The work to be performed, in general, consists of supplying all labor, materials, tools, equipment, implements and methods of process to complete the following work: Removing and replacing the existing PVC domestic water lines with new HDPE water lines within the docks and the gangways, commencing at the potable water points of connection at the water side of the seawalls. The points of connection are at the seawalls and are generally located under the gangways. The project also includes replacing the onshore water supply lines at the following three locations: 1) Gang way (west dock) by the Suisun City marina office, 2) Gangway (west dock) at the easterly terminus of Walnut Street, and 3) Gangway (east dock) at the Solano Yacht Club. The water supply line replacement is from the seawalls to the closest water gate valves. Onshore work also includes removing and replacing gate valves, reduced backflow preventer assemblies and double check detector valve assemblies with Fire Department Connections (CDFs).
For bonding purposes, the Engineer’s for this project is $675,000. Further details of this project are in the full Notice to Contactors available below.
Contract Documents
Copies of the contract document, specifications and drawings may be obtained by logging onto www.blueprintexpress.com/suisuncity or by calling BPXpress Repgrographics at 707-745-3593. These items may be obtained at a set price of $65.00, plus shipping, and is non-refundable.
Proposal Process
Contractors shall submit sealed proposals to the Public Works Department of the City of Suisun City, 701 Civic Center Boulevard, Suisun City, CA 94585 no later than 2:00 PM on Tuesday February 4th 2020;
Complete details about the proposal process and submission requirements are available in the complete Notice to Contractors linked below.